Project: Within the construction project of "Pap-Namangan-Andijan Railway Electrification: Measurement of baseline noise levels. 3D modeling of noise level distribution on the Fergana Valley (Uzbekistan);
Client: «Nazar Business and Technology». (NBT);
Financed by :Asian Development Bank. (ADB);
Tasks: Measurement of baseline noise levels. 3D modeling of noise level distribution.

CATEGORY - Exmination Lab
Project: "Measurement of baseline noise level and noise level propagation modeling near the manganese mine in Chiatura";
Client: «Georgian Manganes LLS»;
Financed by: «Georgian Manganes LLS»;
Tasks: Measurement of baseline noise level and noise level propagation modeling in the vicinity of Chiatura Manganese mine owned by «Georgian Manganes LLS».
CATEGORY - Exmination Lab
Project: „Tbilisi Bypass Construction“;
Client: ANAS International Enterprise; 
Financed by: Asian Development Bank (ADB);
Tasks: Preparation of noise baseline along the alignment; Conducting noise and vibration modeling; Preparing the reports.


CATEGORY - Exmination Lab
Project: Construction and operation of JSC Caucasus Wind Company's Kaspi Power Plant (54 MW), 110 kV OHL and 110 kV substation;
Client:  „WEG Envy Consulting” LTD;
Financed by: JSC “Caucasus Wind Company“;
Tasks: Conducting noise modeling and preparation of the report.
CATEGORY - Exmination Lab
Project: Project for construction and operation of 220 kV OHL Tbilisi substation and substation of JSC Caucasus Wind Company in Dzegvi Lisi community of Mtskheta municipality;
Client:  „WEG Envy Consulting” LTD;
Financed by: JSC “Caucasus Wind Company“;

CATEGORY - Exmination Lab
Project: Construction and operation of 85 MW wind power plant "Imereti-1" in Sachkhere Municipality;
Client:  „WEG Envy consulting” LTD;
Financed by: JSC “Usasrulo Energia“;
Tasks: Conducting noise modeling and preparation of the report.




CATEGORY - Exmination Lab
Project: “Tajikistan: Kangurt to Baljuvon to intersection Vose-Khovaling Road Rehabitation and Reconstruction of Bridge No:5 and Bridge No:6”;
Client: SMEC International PTY Ltd (Australia);
Financed by: Asian Development Bank (ADB);
Tasks: Conducting baseline noise monitoring near the sensitive receptors; Conducting noise modeling survey all along the alignment;
Project completed: September 10, 2019.
CATEGORY - Exmination Lab
Project: «Construction of the Marshal Gelovani Avenue and Mtkvari River Right Bank Intersection“;
Client: «DOHWA Engineering Co» (Korea);
Financed by: Asian Development Bank (ADB);
Task: meazurement of noise and vibration and  3D modeling , conducting report;
Project completed: In  2019.



CATEGORY - Exmination Lab
Project: «Construction/Rehabilitation of Telavi Water Supply System»;
Financed by: Asian Development Bank;
Client: United Water Supply Company of Georgia;
Tasks: Measuring the baseline environmental values at the nearest receptors, in the project area.
On July 10, 2017, an agreement was concluded between «Eptiza Servicios of Ingenieria SL“ (Spain) and “Ltd Eco-Spectri”, under which “Ltd Eco-Spectri”, as a sub-contractor has to implement the following actions: