Project:
Measurement of quality indicators of the working zone at Khmarhesi
1 and Khramhesi 2 hydropower plants; Client: LTD“Khramhesi 1“ and LTD“Khramhesi 2“; Financed by: LTD“Khramhesi 1“ and LTD“Khramhesi
2“; Task: Measurement and analysis of background noise
levels, measurement and analysis of the mechanical vibration impact
levels.
Project:
Construction of schools in the villages of Supsa, Nigvziani and
Didi Chkoni; Client: LTD „Georgian Construction Group“; Financed by: Asian Development Bank (ADB); Task: Measurement of background noise level,
measurement of mechanical vibration impact level, measurement of
airborne contaminants and airborne particulate matters (PMs) in the
teritory specified by
Project: The
construction of a kindergarten in the village of Bodbe and the
village of Chiauri; Client: “Instali” Ltd; Financed by: Asian Development Bank (ADB); Task: Measurement of environmental quality
parameters.
Project: The
construction of a kindergarten in the village Kurdghelauri, Telavi
Municipality; Client: „Satave” Ltd.; Financed by: „Satave” Ltd.; Task: Instrumental measurements of noise,
vibration and the concentration of harmful substances (PM 2.5,
PM10) in the air.
Project: Instrumental Measurement and analysis of
basal vibration levels at Gudauri construction site; Client: “Vertex” Ltd; Financed by: “Vertex” Ltd; Tasks: Measurement of vibration and preparation of
the report; Project completed: in 2021.
Project: Construction of Kvesheti-Kobi Road; Client:“China Railway Tunnel Group Co LTD Branch
in Georgia“; Financed by: “China Railway Tunnel Group Co LTD
Branch in Georgia“; Task: Measurement of vibration and
preparation of the report.
Project: Construction of a waste water treatment
plant in Marneuli; Customer: “INSI“ Ltd; Financed by: “INSI“ Ltd; Task: Measurement of noise, vibration, major air
pollutants.