Project: Construction block manufacturing
enterprise; Client: "Bedegi" Ltd; Financed by: "Bedegi" Ltd; Task: Measurement of quality indicators of the
environment; Project completed: in 2022.
Project:
Improvement of Telavi water supply system; Client: “Geo Build” ltd; Financed by: “Geo Build” ltd; Task: Instrumental measurement of the background
level of noise and concentration of the main pollutants of the
atmospheric air; Project completed: in 2022.
Project:
Asphalt-concrete plant of Terjola; Client: „New Road “ Ltd ; Financed by: „New Road “ Ltd ; Task: Measurement of the concentrations of the
main pollutants of the atmospheric air (PM10, PM2.5, NO2, CO) in
the surrounding area of the enterprise.
Project: Mestia
Rehabilitation Project; Client: „Architects and Company“ Ltd; Financed by: Asian Development Bank (ADB); Task: Measurement and analysis of background noise
level, measurement and analysis of mechanical vibration impact
level, Measurement of the concentration of major pollutants in the
atmospheric