„Preparation of the EIA Document for Batumi-Akhaltsikhe Power Transmission Line“
Project: „Preparation of the EIA
Document for Batumi-Akhaltsikhe Power Transmission Line“.
Ltd
“Eco-Spectri” subcontracted by WEG
(Georgia);
Client: JSC “Georgian State
Electrosystem” (GSE);
Financed by: The World Bank (WB);
Financed by: The World Bank (WB);
Tasks: Preparation of
Environmental Impact Assessment (EIA); Conducting
public consultations according to WB
requirements.
Join Us