Tasks: Holding an
environmental audit of Project closure for the Project
«Construction of Wastewater Treatment Plant in
Anaklia»;
On
June 7, 2018, an agreement was concluded between Eptiza
Servicios of Ingenieria SL (Spain) and “Ltd Eco-Spectri” under which
“Ltd
Eco-Spectri”, as a sub-contractor had to implement
the following actions:
1. study of the environmental
protection documents and Action Plan developed within the scope of
the project;
2. evaluating the results of the
audits/monitoring and inspections and efficiency of corrective
actions in the environmental protection field implemented within
the scope of the project;
3. holding a third-party audit
to confirm that all actions are implemented in line with the
requirements of the Restoration Action Plan;
Project closed on: February 1,
2019