Project: Reconstruction of voltage substation of Ltd.”HeidelbergCement Georgia” Rustavi factory;
Client: Ltd.”HeidelbergCement Georgia”;
Financed By: Ltd.”HeidelbergCement Georgia”;
Assignment: Preparation of Screening report;
Project completed: in 2021.



CATEGORY - Completed Projects
Project: Construction of Sadakhlo-Bagratasheni bridge;
Client: “VMK Construction”Ltd;
Financed by: “VMK Construction” Ltd;
Task: Environmental, occupational health and safety consulting services;
Project completed: in 2021.



CATEGORY - Completed Projects
Project: “Kvarlis Baga” Ltd. Dairy production enterprise;
Client: “Kvarlis Baga” Ltd;
Financed by : “Kvarlis Baga”Ltd;
Task: Preparatn of screening report;
Project completed: in 2021.




CATEGORY - Completed Projects
Project: Digomi floodplains recreation park project in Tbilisi;
Client: NNLE "Caucasus Regional Environmental Center";
Financed by: NNLE "Caucasus Regional Environmental Center";
Tasks: 24-hour continuous instrumental measurement of baseline noise level and measurement of inorganic dust, nitrogen dioxide, sulfur dioxide, carbon monoxide and carbon dioxide in the air;
CATEGORY - Completed Projects
Project: Measurement of noise in the asphalt plant, Akhalkalaki, Khospio.
Client : ”Javakhavtogza “LLC.
Financed by : ”Javakhavtogza “LLC.
Task : 24-hour continuous instrumental measurement of baseline noise level (noise result every 1 second).
Project conmpleted: in 2021.



CATEGORY - Completed Projects
Project Name: Construction and operation project of a brick factory in Kaspi municipality;
Client: „Keramika el torente“LTD;
Financed by: „Keramika el torente“LTD;
Assignment: Preparation of an environmental impact assessment document within the project, organizing and conducting of public consultation;
Project completed: in 2021.

CATEGORY - Completed Projects
Project: Compilation of atmospheric air pollution report for enterprise of dairy production “Khvarlis Baga “ LTD;
Client: “Khvarlis Baga” LTD;
Financed by: “Khvarlis Baga” LTD;
Task: Preparation of a technical report on the stationary sources of air pollution and the inventory of harmfulsubstances emitted by them;
CATEGORY - Completed Projects
Project: Within the construction of Central Asia-South Asia CASA-1000 Electricity Transmission and Trade Project: Preparation of a resettlement action plan.(Tajikistan);
Client: "Kukhistoni" Republican Fund. JSC;
Financed by: The World Bank (WB); 
Tasks: Preparation of a resettlement action plan.
Project completed: in 2021.

CATEGORY - Completed Projects
Project: Preparation of assessments and reports on climate change and biodiversity at the Bodornahes hydropower plant;
Client: “Georgian Water and Power “Ltd;
Financed by: “Georgian Water and Power “Ltd;
Tasks: Climate risk screening, developing of climate change scenarios and preparation of climate change