Measurement of baseline noise levels and noise modeling within the framework of the Ruisi Wind Farm Construction and Operation Project
Project: Construction and Operation of Ruisi Wind Farm;
Client: "WEG Envi Consulting" LLC;
Financed by: "WEG Envi Consulting" LLC;
Task: Measurement of noise levels and noise modeling;
Project completed: in 2024.
Client: "WEG Envi Consulting" LLC;
Financed by: "WEG Envi Consulting" LLC;
Task: Measurement of noise levels and noise modeling;
Project completed: in 2024.