Measurement of environmental qualitative parameters at "Khramhesi 1" hydroelectric power station
Project: Operation of "Khramhesi 1" hydroelectric power
station;
Client: JSC "Khramhesi 1";
Financed by: JSC "Khramhesi 1";
Task: Instrumental measurement of environmental qualitative parameters and preparation of survey report;
Project completed: in 2023.
Client: JSC "Khramhesi 1";
Financed by: JSC "Khramhesi 1";
Task: Instrumental measurement of environmental qualitative parameters and preparation of survey report;
Project completed: in 2023.