„Preparation of the EIA Document for Batumi-Akhaltsikhe Power Transmission Line“
Project: „Preparation of the EIA
Document for Batumi-Akhaltsikhe Power Transmission
Line“;
Ltd
“Eco-Spectri” subcontracted by WEG
(Georgia);
Client: JSC “Georgian State
Electrosystem” (GSE);
Financed by: The World Bank
(WB);
Tasks:
Preparation of Environmental Impact Assessment
(EIA); Conducting public consultations according
to WB requirements.