“Preparation of the Design Services for the Construction of the Road Connecting Lentekhi and Mestia Municipalities and Feasibility Study for the Construction of the Road Tunnel”.
“Preparation of the Design Services for the Construction of the Road Connecting Lentekhi and Mestia Municipalities and Feasibility Study for the Construction of the Road Tunnel”.
Project: “Preparation of the Design Services for the Construction of the Road Connecting Lentekhi and Mestia Municipalities and Feasibility Study for the Construction of the Road Tunnel”;
Client: “INSTITUT IGH”, Joint Stock Company on Civil Construction Research and Development.
Implementing Agency: Roads Department of Georgia;
Financed by: The World Bank; 
Tasks: Preparation of the Ressettlement Action Plan based on the field survey data to be obtained by the Resettlement Research Group; preparation of the Plan in line with the requirements of the WB and Georgian legislation; Drafting the new cadastre maps; Preparing Inventory of losses; Conducting social survey; Organizing public consultations;
Project completed: October 7, 2019.
;