Construction of Wastewater Treatment Plant in Anaklia Settlement
Project: Construction of
Wastewater Treatment Plant in Anaklia Settlement;
Client: United
Water Supply Company of Georgia;
Financed
by: Asian
Development Bank;
Tasks: Holding an
environmental audit of Project closure for the Project
«Construction of Wastewater Treatment Plant in
Anaklia».
On June 7, 2018, an
agreement was concluded between Eptiza Servicios of
Ingenieria SL
(Spain)
and
“Ltd
Eco-Spectri”, under which
“Ltd
Eco-Spectri”, as a sub-contractor had to implement
the following actions:
1. study of the environmental
protection documents and Action Plan developed within the scope of
the project.
2. evaluating the results of the
audits/monitoring and inspections and efficiency of corrective
actions in the environmental protection field implemented within
the scope of the project.
3. holding a third-party audit
to confirm that all actions are implemented in line with the
requirements of the Restoration Action Plan.
Project closed on: February 1,
2019.