«Design Services for the Construction and Reconstruction of Sno-Juta-Roshka-Shatili-Omalo-Khadori Gorge-Batsara-Akhmeta Road Passing through Telavi, Akhmeta, Dusheti and Kazbegi Municipalities»
«Design Services for the Construction and Reconstruction of Sno-Juta-Roshka-Shatili-Omalo-Khadori Gorge-Batsara-Akhmeta Road Passing through Telavi, Akhmeta, Dusheti and Kazbegi Municipalities»
Project: «Design Services for the Construction and Reconstruction of Sno-Juta-Roshka-Shatili-Omalo-Khadori Gorge-Batsara-Akhmeta Road Passing through Telavi, Akhmeta, Dusheti and Kazbegi Municipalities»;
 
Implementing Agency: Roads Department of Georgia;
 
 
Client: “INSTITUT IGH”;
 
Financed by: The World Bank;
 
Tasks:  Preparation of Ressettlement Action Plan based on the field survey data and in line with the requirements of the WB and Georgian Legislation; Drafting the new cadastre maps; Preparing Inventory of losses; Conducting social survey; Organizing public consultations; 
 
Project completed: October 7, 2019. 
;