«Design Services for the Construction and Reconstruction of Sno-Juta-Roshka-Shatili-Omalo-Khadori Gorge-Batsara-Akhmeta Road Passing through Telavi, Akhmeta, Dusheti and Kazbegi Municipalities»
Project:
«Design Services for the Construction and Reconstruction of
Sno-Juta-Roshka-Shatili-Omalo-Khadori Gorge-Batsara-Akhmeta Road
Passing through Telavi, Akhmeta, Dusheti and Kazbegi
Municipalities»;
Implementing
Agency: Roads Department of Georgia;
Tasks:
Preparation of Ressettlement Action Plan based on the field survey
data and in line with the requirements of the WB and Georgian
Legislation; Drafting the new cadastre maps; Preparing Inventory of
losses; Conducting social survey; Organizing public
consultations;
Project
completed: October 7, 2019.
Join Us