Conducting vibration propagation study (3D modeling) within the framework of the modernization and construction project of the Tbilisi-Rustavi section (section 2)
Project: Preparation of a
feasibility study for the modernization and construction of the
Tbilisi-Rustavi section (section 2) of the Tbilisi-Tsiteli Khidi
(Azerbaijani border) road;
Client: LLC “Gamma
Consulting”;
Financed by: LEPL “Municipal
Development Fund”;
Task: Measurement and analysis of
the baseline
vibration levels in the vicinity of the Tbilisi-Rustavi section
(section 2); 3D modeling vibration propagation during the
construction and operation stages of the project and development of
appropriate mitigation measures;
Project completion: in
2025.