Head of Resettlement and
Social Issues Unit
Project Management Board member
Zurab
Revazishvili graduated from Georgia Polytechnic Institute,
Faculty of Automatic Machinery and computer engineering/techniques,
with the specialty of an engineer-system technician (major in
automated systems of management). In 2018-2019 Zurab
Revazishvili has successfully completed the following
accredited courses of “Exemplar Global” and
received international certification in:
ISO19011:2018 – Auditing management systems,
ISO 45001:2018 - auditor/lead auditor of
occupational health and safety management
systems and
ISO
9001:2015 - auditor/main auditor of quality management
systems.
Besides, he completed the trainings
and obtained the certificates in the courses, like: World Bank
Training on “environmental and social issues” in 2008; training of
Certification body of Professional Development Center of experts
and valuators “ immovable property valuator” –
2019. Work Experience:
During 2014-2015 Zurab Revazishvili worked as the
Project Coordinator/Social Safeguards and Resettlement Expert at
International Projects and Reporting Department of JSC “Georgian
State Electrosystems”. In 05/2003 – 10/2005 he worked within
Baku-Tbilisi-Ceyhan pipeline monitoring and audit project
(PMDI) as a waste management expert. Zurab
Revazishvili has been working as the resettlement and
social issues specialist in “Eco-Spectri” Ltd since 2012. He
has participated in the projects, funded by the International
Financial Institutions in terms of social and resettlement
issues. Within given projects, he took part in field works,
information gathering and analysis, elaboration of mitigation
measures and preparation of management plans and conducting public
consultations. In the frame of the projects, provided above, he
gained experience in communicating with the public organizations
and International Financial Institutions. Zurab
Revazishvili since 2018 was promoted as the Head of
Resettlement and Social Issues Unit of the company
“Eco-Spectri”. As the
specialist, referred above, he participated in the infustrucutral
projects of state importance funded by the International Financial
Institutions (World Bank, Asia Development Bank, European
Investment Bank), like: “Design Services for the Construction and
Reconstruction of Sno-Juta-Roshka-Shatili-Omalo-Khadori
Gorge-Batsara-Akhmeta Road Passing through Telavi, Akhmeta, Dusheti
and Kazbegi Municipalities” (2019); “Preparation of the Design
Services for the Construction of the Road Connecting Lentekhi and
Mestia Municipalities and Feasibility Study for the Construction of
the Road Tunnel” (2019.); “Preparation of the Design Documentation
to Construct the Road on Chakvi-Makhinjauri Section of
Senaki-Poti-Sarpi International Road and Implementation of the
Rehabilitation Works”. (2018 წ.); “Construction of the Marshal
Gelovani Avenue and Mtkvari River Right Bank Intersection”
(03.03.2018 – 01.12.2018); “Preparation of Environmental and Social
Impact Assessment Report for Upgrading Road for following section:
Rustavi-Red Bridge, Algeti-Sadakhlo, Tbilisi-Sagaredjo and
Sagaredjo-Bakurtsikhe” (2018); “Construction of Railway to Kutaisi
international Airport” (01.5.2017 – 01.08.2017); “Modernization of
Georgian Railway” (2016-2017); “Preparation of Resettlement Action
Plan/Abbreviated Resettlement Action Plan for Urban Regeneration of
historical streets in Dusheti, Urban regeneration of Abastumani and
Arrange of tourism infrastructure at Ananuri castle Sub-Projects”
(2017); “Construction of New Sanitary Landfill in Adjara Region“
(2016-2017); “Anaklia coastline improvement project” (2014.-2015);
„Tbilisi-Rustavi road upgrade project, secondary road construction
for third section of the road” (2013-2014); “Schools rehabilitation
project” (2015-2018); „Akhaltsikhe-Batumi 220 Kv Power
Transmission Line construction and service project”
(12.2013-02.2014).
Join Us